Purpose
Improve streetlight pole identification, public reporting accuracy and field readability without changing existing numbering systems.

Utility operations
A contained operational evaluation to improve pole identification, public reporting accuracy, field readability and downstream maintenance clarity.
What the pilot tests
The evaluation is designed to test a field-visible overlay without replacing or renumbering the existing asset-identification system.
Improve streetlight pole identification, public reporting accuracy and field readability without changing existing numbering systems.
A contained 2,000-pole evaluation using high-contrast reflective overlays and QR-enabled map access within defined operating limits.
Utility operations, streetlight asset management, public reporting and field maintenance teams.
Reporting accuracy, field readability, location clarity, public-reporting friction and pre/post operational signals.
Review-ready outputs
Decision supported
This is an independent proposal concept prepared for utility review. No endorsement, procurement decision or adoption is implied.
Request the proposal package and include your organization or intended operational review context.